S R F    2 0 0 3

SRF2003 Show Abstract


Title SCRF Activities for the ISAC-II Upgrade at TRIUMF
Type Poster laboratory reports
Abstract TRIUMF is proceeding with a major upgrade to the ISAC project, ISAC-II, that includes the addition of 43 MV of heavy ion superconducting linear accelerator. An initial installation of 18 MV of mid beta quarter-wave bulk niobium cavities (beta=5.8%, 7.1%) is due for commissioning in 2005. A SCRF laboratory consisting of clean assembly and rinse area plus an rf test area is operational with an active program for cavity preparation and coupling loop and tuner developments. The paper will describe the superconducting linac program at TRIUMF including the status of the production cavities, the design of the medium beta cryomodule and a summary of the activities of the SCRF laboratory.

List of authors...

Principle author first.

Last (Family) Name First Name (Initials only) Affiliation or Organization (abbreviations if possible)
Laxdal R.E TRIUMF
Fong K TRIUMF
Mitra A.K TRIUMF
Poirier R TRIUMF
Ries T TRIUMF
Sekachev I TRIUMF
Stanford G TRIUMF



SRF 2003Webmaster